SINO Covid-19 Self Test Kit mould

2022-06-30

First of all, the most important thing for the Covid-19 self test kit mould is the wall thickness control of the product, not eccentric, so the parallelism of each template and the hole concentricity of the insert is very high, the traditional process uses boring machine processing but the accuracy is difficult to control. Casino to coordinate grinding, ensures the parallelism of template processing and edge concentricity in 0.01 mm, steel material with German import stainless steel materials, die life is greatly increased; Mould frame also use high quality pre-hard steel, hardness is higher, flatness is better! At the same time, the core cavity after mirror polishing treatment, so that the surface of the tube to achieve a higher degree of finish.


Secondly, the multi-cavity Covid-19 self test kit mould can realize the exchange function. Covid-19 self test kit mould core adopts independent self-locking structure, which can realize the product size, gram, wall thickness, swaps, reduce user repeat investment cost and the subsequent maintenance costs.


Finally, the choice of the gate of the test kit, the more the number of kit mold cavities, the greater the difficulty coefficient, the molten material in the cavity needs to be completed quickly after injection cooling will not appear eccentric, so the temperature control balance of the gate is very key. SINO Covid-19 self test kit mould adopts independent research and development of Anole needle valve hot runner gate, high design precision, gate is convenient for fast injection and close sealing material, at the same time, the use of large water cooling system to enter and exit water to achieve rapid cooling, melt cooling in the cavity uniform, to avoid eccentric products.

After machine testing, the concentricity, eccentricity and smoothness of the sample are confirmed to be qualified once and for all, so as to create a high standard and high quality test tube mould for users. For different specifications of the tube mould, the cycle can be controlled in 10-12s.


  •